checked,publisher,type,fitting_time_published,wait_from_order_published,sources 2026-10-07,Stiltz,maker,One day 'once the aperture in the ceiling has been prepared by a qualified builder'; home lifts page: 'most installations are carried out in a single day*' / '*Excluding time required to cut aperture','The normal lead time from placing an order to project completion is six to eight weeks',https://www.stiltz.co.uk/about-us/faqs/ | https://www.stiltz.co.uk/home-lifts/ 2026-10-07,Lifton,maker,'usually have it operational in one day' once aperture 'prepared by a qualified builder','from six to eight weeks' order to project completion,https://www.lifton.co.uk/frequently-asked-questions/ 2026-10-07,Stannah (Uplifts),maker,"'within just a few days' (enquiry process, S3, why-uplifts); 'often completed within a single day' (installation blog)","'Typically the process from order to installation takes 12 weeks' incl. drawings, building works, aperture",https://www.uplifts.com/about-us/frequently-asked-questions/ | https://www.uplifts.com/blog/everything-you-need-to-know-about-homelift-installation-with-uplifts/ 2026-10-07,Cibes,maker,'only take 2-3 days to install' (FAQ); home lifts 'a few days'; cabin lifts 3-4 days,'manufacturing time of three weeks' (homepage),https://cibeslift.com/en-gb/tools-docs/faqs | https://cibeslift.com/en-gb 2026-10-07,SWIFT,maker,"'2-4 days for platform lifts, with more time required for additional floors'",'The typical duration is usually 4 to 6 weeks for standard lifts' (blog pub 2025-01-17 mod 2026-03-08),https://swiftlifts.com/en/blog/domestic-lift-installation-process-explained-from-planning-to-completion/ 2026-10-07,Companion,maker,"FAQ: 'can be as little as one day. Generally, it takes 1-2 days'",Not on website; 8-10 weeks through-floor supplied directly by Companion July 2026,https://www.companionhomelifts.co.uk/faqs 2026-10-07,Terry Lifts,maker,Harmony: 'fitted in less than two days' after survey and 'any necessary preparatory work'; spec 'Installation: Two days'; buyers guide 'often in just two days',Not published,https://www.terrylifts.co.uk/lifts/harmony-through-floor-lift-2/ | https://www.terrylifts.co.uk/buyers-guide/ 2026-10-07,Wessex Lifts,maker,'installation usually takes 1 or 2 days depending on model'; 'shouldn't take more than 2 days to fit',Not published,https://www.wessexlifts.co.uk/home-lifts 2026-10-07,Gartec,maker,"Two-stop platform 'roughly 2 days to be installed, tested and commissioned', +1 day per extra floor; cabin 'roughly 3 days'; 20amp supply from first day",Not published,https://gartec.com/faqs/ 2026-10-07,Aritco,maker,'Your Aritco home lift will be installed in just a few days' (step 8); FAQ 3-4 days is for commercial elevators,Not published,https://www.aritco.com/uk/products/home-lifts/buy-a-home-lift/ 2026-10-07,Pollock,maker,Cabin lifts 'in just a few days'; FAQ nothing,Not published,https://pollocklifts.co.uk/all-products/cabin-lifts/ 2026-10-07,Morgan Ellis,dealer,'will differ between models and site requirements',50% deposit; production 'up to 8-10 weeks following approval'; PM visit 'Around 2-4 weeks prior',https://www.morganellis.co.uk/process-of-buying-a-home-lift/ 2026-10-07,GOV.UK,regulator,n/a,Building notice: 'You can start work 2 days after your notice has been submitted'; full plans decision within 5 weeks or 2 months with consent,https://www.gov.uk/building-regulations-approval/how-to-apply